Register  |  Log In  |  Contact Us

JCS1200 Platform Hardware Installation and Configuration - WBT

 
JCS1200 Platform Hardware Installation and Configuration - WBT 
JCS1200 Platform Hardware Installation and Configuration - WBT

About this Course

This Web-based training (WBT) is a self-paced course that describes the preinstallation, installation, hardware replacement, and initial configuration processes for the JCS1200 Platform. It is designed to provide those who install or service the hardware with detailed demonstrations and technical information.



Course Objectives

On completing this course, you will be able to:

  • Specify preinstallation and configuration considerations for the JCS1200 Platform.
  • Install, service, and complete initial configuration of the JCS1200 Platform.

Course Contents

Section 1: Introduction

Section 2: JCS1200 Platform Installation

  • Section Objectives
  • Product Overview
  • Safety Requirements, Warnings, and Guidelines
  • Tools and Components Required
  • Preparing for Installation
  • Unpacking the JCS1200 Platform
  • Installing the Mounting Hardware
  • Installing the JCS1200 Using a Mechanical Lift
  • Installing the JCS1200 Without a Mechanical Lift
  • Providing Power to the JCS1200 Platform
  • Connecting the JCS1200 AC Platform to AC Power
  • Connecting the JCS1200 DC Platform to DC Power
  • Connecting the JCS1200 Management Module to the Network
  • Establishing a JCS1200 Management Module Connection
  • Connecting a Console to the JCS1200 Routing Engines
  • Powering On and Off a JCS1200 Routing Engine
  • Connecting the JCS1200 Platform to a T-Series Routing Platform
  • Completing the JCS1200 Installation
  • Section Summary
  • Practice Activities

Section 3: Configuring the JCS1200 Platform

Section 4: Replacing a JCS1200 Alarm Panel Module or Module Filler

Section 5: Replacing a JCS1200 Bezel

Section 6: Replacing a JCS1200 Bezel Collar

Section 7: Replacing a JCS1200 Bezel Filter

Section 8: Replacing JCS1200 Cable Management Trays Without a Bezel

Section 9: Replacing a JCS1200 DC Terminal Cover

Section 10: Replacing a JCS1200 Fan Module

Section 11: Replacing a JCS1200 Fan Shuttle

Section 12: Replacing a JCS1200 Management Module or Module Filler

Section 13: Replacing a JCS1200 Management Module Interposer or Filler Tray

Section 14: Replacing a JCS1200 Media Tray

Section 15: Replacing a JCS1200 Midplane

Section 16: Replacing a JCS1200 MUX Card

Section 17: Replacing a JCS1200 Network Clock Filler

Section 18: Replacing a JCS1200 Power Box

Section 19: Replacing a JCS1200 Power Module

Section 20: Replacing a JCS1200 Routing Engine

Section 21: Replacing a JCS1200 Switch Module or Module Filler

Section 22: Replacing a JCS1200 Switch Module Interposer or Filler Tray

Section 23: Additional Information

Section 24: Course Summary